
The scheme comprises a purpose-built, nine-storey reinforced concrete structure, including a basement and roof level. The building occupies the full site footprint to maximise the number of hotel rooms and incorporates a stepped façade design towards the roof to respond to its urban context.
The development provides retail and office accommodation at ground and first floor levels, with the basement and upper floors dedicated to hotel use.
CGI render courtesy of Curio Architects – for illustrative purposes only
Structural and Civil Engineering works across the site
Redevelopment of a 30 storey building with double storey basement
Convenient option for passengers flying from LLA
A complex refurbishment on the site of the former Winchester Cathedral