Topping Out

19 June 2025

Share

Luton Airport Topping Out Ceremony

Project milestone achieved

A momentous occasion was reached yesterday, with the topping out ceremony of the new multi storey car park at London Luton Airport, 20 months since the original structure was destroyed by the fire.

In that time we’ve built a new drop off zone with major infrastructure upgrades, demolished the building, rebuilt a foundation system and laid drainage capable of storing 160,000 litres of sprinkler discharge.

Left to right: Alberto Martin (CEO, London Luton Airport); Marc Wolman (Infrastructure Director, London Luton Airport); Alec Carr (Senior Project Manager, BAM)